Operations & Supply Chain | PGDM (Ops & SCM), Welingkar Institute of Management | Ex-Software Engineer, Ford Motor Company | Process Improvement · Data-Driven Problem Solving
Monterrey, NLE

Chennai

Tamil Nadu, India

India

Chennai, Tamil Nadu

Tinsukia Area, India







PGDM EBiz, IT Management
Welingkar Institute of Management

B. Tech, Computer Science and Engineering
SRM IST Chennai
Join Suraj and 10k+ other professionals on
Tal is the app where bosses meet engineers & builders directly, without middlemen
Download Tal BossOperations & Supply Chain | PGDM (Ops & SCM), Welingkar Institute of Management | Ex-Software Engineer, Ford Motor Company | Process Improvement · Data-Driven Problem Solving
I bridge two worlds: 3+ years building enterprise software at Ford Motor Company, and hands-on operations experience driving process improvements on the factory floor at Mattel Inc. At Mattel, I used Pareto analysis on AS-400 production data to identify a finished-goods recording gap, retrained material handlers on the fix, and scaled it across 3 plants - sustaining a zero-error period afterward. At Ford, I applied the same root-cause, data-first approach to software systems: I extracted and rebuilt a scheduler application that cut startup time significantly, and automated a manual archival process end-to-end via CI/CD - eliminating hours of repetitive work. I have completed my PGDM in Operations & Supply Chain Management at Welingkar Institute of Management (2026), actively seeking roles in Operations, Supply Chain, or Project Management where I can combine process rigor with a builder's instinct for fixing what's broken before anyone asks. Open to opportunities in Operations Analyst, Supply Chain, and PMO roles.
Greater Bengaluru Area
claude code
claude
deepseek
lovable
openai
Gamma
Operations Intern at Mattel, Inc., May 2025 - Oct 2025 · 6 mos, Monterrey, NLE, - Diagnosed a finished-goods recording gap using Pareto analysis on AS-400 production data, isolating the root cause behind persistent reporting discrepancies across the plant. - Retrained material handlers on corrected recording procedures and redesigned the process to prevent recurrence, sustaining a zero-error period following implementation. - Scaled the corrected process from a single pilot line to Plants B, C, and M - standardizing production tracking across the full Monterrey operation. - Piloted a Vision Sensor camera system for real-time production recording, reducing manual data-entry errors and laying groundwork for automated reporting. - Partnered with cross-functional plant teams (production, quality, IT) to translate a shop-floor Industry 4.0 initiative into a repeatable, multi-site standard.
Software Engineer - HTHD at Ford Motor Company, Apr 2022 - Sep 2023 · 1 yr 6 mos, Chennai, - Built a rules-based combination engine to auto-generate feasible Product/Model/Family/Feature configurations for a given Program, replacing manual configuration checks with a repeatable, auditable process. - Integrated the solution with Ford's Team Center PLM system, ensuring configuration logic stayed aligned with live product data - improving accuracy and reducing rework for downstream teams.
Software Engineer at Ford Motor Company, Jul 2020 - Apr 2022 · 1 yr 10 mos, Tamil Nadu, India, - Identified and closed a performance bottleneck in a core enterprise application by researching and benchmarking an alternative data-interchange format (SDIF) against the legacy standard. - Delivered a 30% reduction in processing time and up to 60% reduction in memory usage, driving the team's adoption of the new format — a data-driven efficiency win with direct infrastructure cost impact. - Independently designed and built a replacement scheduling system (Spring Boot) after identifying failure points in the legacy scheduler, cutting application startup time and improving system reliability. - Exposed the new scheduler through a monitoring interface (JMX), giving non-technical stakeholders self-service visibility and control — reducing dependency on engineering for routine task management. - Automated a manual, error-prone deployment process by building a CI/CD pipeline (Jenkins), eliminating repetitive manual work and shortening release cycles.
Intern at Cognizant, Feb 2020 - Jun 2020 · 5 mos, India, Worked on projects pertaining to Data Analytics using software(s) Tableau, Qlik, PowerBI
Software Intern at KC COTTRELL INC., Sep 2019 - Jun 2020 · 10 mos, Chennai, Tamil Nadu, Developed a whole new Timesheet and Opportunity Management System, tailored to the requirements of the organization.
Internship Trainee at Bharat Sanchar Nigam Limited, May 2018 - Jun 2018 · 2 mos, Tinsukia Area, India
PGDM EBiz, IT Management, Welingkar Institute of Management
B. Tech, Computer Science and Engineering, SRM IST Chennai