Project Engineer | Site Engineer | Quantity Surveyor | Planning Engineer | Marine & Wharf Construction | Variation Orders | Open to Singapore & GCC
Singapore

Singapore

Singapore

Chennai

B.E (civil), Civil Engineering
Anna University Chennai
Join Naveen and 10k+ other professionals on
Tal is the app where bosses meet engineers & builders directly, without middlemen
Download Tal BossProject Engineer | Site Engineer | Quantity Surveyor | Planning Engineer | Marine & Wharf Construction | Variation Orders | Open to Singapore & GCC
Site & Project Engineer with 5+ years' experience across Singapore and India, covering marine RC infrastructure, semiconductor fab construction, and main-contractor building/A&A works. Delivered a 1.2km marine wharf for PSA Singapore under main contractor TOA Corporation, semiconductor fab structural works under EXYTE, and three main-contractor projects at GTM Engineering — including a live-plant pharma demolition & QC lab renovation (SGD 120,000 recovered through variation order and additional works claims) and a high-security utility boundary fence project delivered to a tight schedule. Hands-on across QTO/MTO, BBS, RFI submittal, method statements & risk assessments (MOS/RA/SWP), subcontractor management, vendor procurement, and QA/QC inspection, with working knowledge of variation and EOT claims (FIDIC/PSSCOC) and planning tools (Primavera P6, MS Project). Pursuing SISV APQS accreditation for Quantity Surveying. Open to Project Engineer / Site Engineer / Quantity Surveyor / Planning Engineer roles in Singapore and across the GCC (UAE, Qatar, Saudi Arabia). Available for immediate deployment.
Mayiladuturai Taluka
Site Civil Engineer at Kian Ka Construction Pte Ltd, Sep 2025 - May 2026 · 9 mos, Singapore, PSA Wharf Development | Client: PSA Singapore | Main Contractor: TOA Corporation • Joined the project mid-way and coordinated across rebar, formwork, welding, casting, and finishing/painting teams to bring works back on track to master schedule • Executed structural RC works across caisson capping slab, wharf base slab, trench wall, fascia beam, front and rear crane rail beams, gully chambers, and drain works • Secured Extension of Time (EOT) for a client-driven design change (F2 to F3 connection), managing schedule impact while maintaining zero safety incidents • Managed 110+ workers to hit 4-5 major castings per week, 100-300 m³ concrete • Raised RFIs and resolved technical queries in progress meetings with client and consultant; ran 5-7 QA/QC inspections a week with RE/RTO
Project Engineer at GTM Engineering Pte Ltd, Apr 2024 - May 2025 · 1 yr 2 mos, Singapore, Three sequential main-contractor projects across 13 months: PharmaGend Global Medical Services — Pharma Building Demolition & QC Lab Renovation (Apr-Aug 2024) • Claimed SGD 120,000 total (SGD 70K VO + SGD 50K additional work) through quantity verification and client/consultant follow-up • Ran a 3-storey live pharma building project — L2 & L3 demolition (SGD 400K) and QC lab renovation (SGD 60K) in parallel • Assisted Senior QS with monthly progress claiming, quantity verification, and BOQ tracking Tuas Power Station — High-Security Boundary Fence (Sep-Dec 2024) • Delivered anti-climb, anti-cut boundary fencing with continuous L-shaped footings, integrating FIDS cabling, lighting poles, and CCTV poles • Coordinated civil and M&E works across two fronts on a tight 3-month schedule to hand land over to SLA on time Residential Fit-Out — HDB & Condominium Renovations (Jan-May 2025) • Managed fit-out works across multiple units, coordinating subcontractor finalization and client handover
Site Engineer at SRK Engineering and Construction Pte Ltd, Feb 2023 - Mar 2024 · 1 yr 2 mos, Singapore, Siltronic Silicon Wafer Fab | Client: Siltronic | Main Contractor: EXYTE Singapore • Led 3-4 supervisors and 30-40 workers with zero safety incidents throughout the project • Executed structural and architectural works including bund wall, parking shelter footings and drain works, wall and floor openings, fire-stopping, and fire-rated drywall partitions • Prepared BBS for slabs, beams, columns, and foundations, and as-built drawings on completion • Conducted safety briefings and coordinated with Safety Officer on compliance
Site Engineer at PSK Group of Construction, Dec 2020 - Jan 2023 · 2 yrs 2 mos, Chennai, G+14 Slum Clearance Residential Building Project • Ran two functions concurrently: weekly labour billing (15+ lakhs per week) and finishing-trade site supervision (brickwork, plastering, putty & painting, flooring & screed works) • Cross-checked actual site progress against original BOQ to verify billing accuracy • Coordinated overnight mass concrete casting shifts, managing a Hindi-speaking workforce for continuous pours • Supervised finishing works managing 3 contractors and 30+ workers
B.E (civil), Civil Engineering, Anna University Chennai