Having a strong project execution background of over 36 years,

Bilaspur, Chhattisgarh, India

Bilaspur, Chhattisgarh, India


Anuppur , Madhya Pradesh

Anuppur, Madhya Pradesh, India
Bachelor of Engineering (B.E.), Mechanical Engineering
Govt. Engg. College, Bilaspur
Higher Secondary School Certificate, Maths, Physics, Chemistry
Govt. Multipurpose High School
Join Devendra and 10k+ other professionals on
Tal is the app where bosses meet engineers & builders directly, without middlemen
Download Tal BossHaving a strong project execution background of over 36 years,
CORE ACHIEVEMENTS • Successfully commissioned and achieved commercial operation of two units of 800 MW Turbine, Auxiliaries and Piping of NTPC-Darlipali 2X800 MW Poject • Construction, Erection, Commissioning and Maintenance of 2X600 MW (Harbin Make) with MB Power Madhya Pradesh Limited. Also recommissioned Unit#2 BTG and BOP after extensive repair of Boiler which met with accident due to Boiler Explosion. • Erection and Commissioning of Mechanical Packages of 5X660 MW Adani Power Maharashtra Limited having super critical boilers (Shanghai make) and achieved commissioning of Five Nos. 660 MW Units as Head of Mechanical Erection Team. • Successfully synchronized the first 500 MW Unit of Sipat Super Thermal Power Project Stage-II ( 2X500 MW) • Successfully completed Hydraulic Test of 2 nos. Super Critical Boilers (Doosan Make) of Sipat Super Thermal Power Project (STPP) Stage-I (3 X 660 MW). First of its kind in India. • Planned and monitored execution of 42 KM long dedicated railroad system for coal transportation and 11 KM Long Railway Siding for Sipat STPP( NTPC) • Commissioned Make up Water System with a Pump House and 2X26 KM pipeline for supply of Raw Watter to Sipat STPP. • Planned and monitored basic infrastructure, Site Levelling, Approach Roads, Storage Space, Plant Drainage, Site Office, Enabling Township, Boundary Wall and IT infrastructure etc. • Monitored acquisition of 4300 Acres of Land, associated in formulation of Rehabilitation and Resettlement Plan and obtaining Environmental Clearance for the project as a member of Core Team and played an active role in Site Selection of Sipat STPP. • Erected and commissioned 4X67.5 MW, Balco Captive Power Plant and operated as Shift-In-charge, including performance monitoring, operation planning of the power plant.
Bilaspur
Business Development Associate at AG Infraventures, Jun 2022 - Present · 4 yrs 1 mo, Bilaspur, Chhattisgarh, India
Business Development Manager at AG Infraventures, Jun 2022 - Present · 4 yrs 1 mo, Bilaspur, Chhattisgarh, India
Site General Manager at Toshiba TSW Power System Pvt. Limited, Dec 2018 - Present · 7 yrs 7 mos, Responsible for erection of TG and Auxiliary, Hydrogen Generation Plant, Condensate Polishing Unit and Elevators of 2X800 NTPC-Darlipali power project which is running commercially.
Sr. Vice President at Hindustan Power, Aug 2017 - Dec 2018 · 1 yr 5 mos, Anuppur , Madhya Pradesh, Working as Team Leader for Construction Activities and Maintenance of 2 X 600 MW MB Power Madhya Pradesh Limited, Anuppur , Madhya Pradesh. A subsidiary of Hindustan Power Pvt. Ltd.
Vice President at MB Power Madhya Pradesh limited, Apr 2014 - Aug 2017 · 3 yrs 5 mos, Anuppur, Madhya Pradesh, India, Working as Chief Construction Manager responsible for Civil, Mechanical , Electrical and C&I packages and Heading Mechanical and Civil maintenance , Maintenance Planning function.
Bachelor of Engineering (B.E.), Mechanical Engineering, Govt. Engg. College, Bilaspur
Higher Secondary School Certificate, Maths, Physics, Chemistry, Govt. Multipurpose High School